On 13 November 2026, Essity announced an investment of about SEK 850 million over three years in a new tissue machine at Lilla Edet, Sweden. Start-up is expected in the fourth quarter of 2028. The machine can use both virgin and recycled fibre. That describes sourcing flexibility, not an announced purchase share or firm order volume for either furnish.
The field problem
Confusing machine capability with procurement can cause pulp suppliers to overstate demand. Essity says the new machine will have 50% more capacity than the existing machine. The statement does not establish a 50% rise in total mill output, or explain whether the new line supplements or replaces a particular existing line.

Evidence to check
The company says the machine is designed for several tissue products, including paper hand towels, toilet paper, napkins and wiping products. The mill mainly serves Professional Hygiene. The disclosed facts are potential furnish and product flexibility, relative machine capacity and planned timing. Actual furnish proportions, grades, supplier awards and purchase volumes are not disclosed.
| Question | Published fact | Missing evidence |
|---|---|---|
| Start-up | Target: Q4 2028 | Commissioning and commercial production records |
| Capacity | New machine: 50% above existing machine | Net mill capacity change |
| Fibre | Virgin and recycled capability | Purchase volumes and grade specifications |
Practical deliverable
Suppliers can keep a milestone-based demand tracker separating equipment announcement, raw-material qualification, commissioning and purchase contracts. Recycled furnish will need application-specific checks for contaminants, colour and strength; virgin furnish must also meet the buyer’s product specification. Obtain Essity’s actual purchasing requirements rather than inventing a furnish split from the press release.

When to hold application
Do not translate this investment into a particular pulp supply deal, recycled-fibre share or mill-wide growth rate without sourcing data and clarification of the existing machine’s role. Treat Q4 2028 as a target, not achieved start-up.
About the Author
PackingMaster: Editor of PaperPackLog. Covers market trends, product insights, and technology in the paper packaging industry.
References
- Essity, Investment in increased Tork capacity at Lilla Edet, 13 November 2026.
Source checked 16 November 2026. Furnish capability is not a purchase forecast.
