
Hanwha Solutions dispatch automation: connect pallet exchange with pack-count control
Award reporting identifies four improvement areas, but no public equipment specification or measured throughput.

Award reporting identifies four improvement areas, but no public equipment specification or measured throughput.

Separate Poomgo’s robot training and planned proof of concept from the performance of its existing packaging automation equipment.

Using the end-to-end and flexible-automation themes discussed at Exo-Seminar Seoul 2026, this guide provides an evidence-based audit sheet for waiting, rework and manual handoffs across inbound, storage, picking, packing, sorting and dispatch.

In July 2026, Paranova Print and Packaging announced a £20 million, five-year investment programme for its fibre-based packaging operations. The centrepiece is a new 98,000-square-foot plant in Godmanchester, Cambridgeshire. The announcement is best read not merely as a capacity expansion, but as an attempt to combine printing, finishing, warehousing and R&D into one operating system designed for shorter lead times and variable demand. The announcement at a glance Paranova announced £20 million of investment over five years. The first stage is a £6 million purpose-built plant in Godmanchester, planned at the time of the announcement to open in November 2026. The building covers 98,000 square feet, with about one-third of its operational footprint planned for warehousing. The site is planned to combine manufacturing, warehousing, office space and R&D functions. Paranova said the following stage would commit another £14 million to additional printing and finishing equipment and a fully automated logistics system. The site is expected to support about 150 employees once fully operational. These figures are planned values reported around 28 July 2026. The final opening date, equipment configuration, output and employment level may change during installation, commissioning and ramp-up. ...

Paper-based bubble wrap such as BIOWRAP should be evaluated as a procurement specification, not only as a sustainability story. Compression strength, moisture behavior, automation fit, disposal labeling, and cost structure all need evidence.